Powercrumbs units at a site in the field

For events, standby power and bridging

You need power in a place where the grid cannot deliver.

Events, standby power, bridging until the grid connection is in place: temporary power per case, with an evidence file that travels with every deployment.

How your delivery works

Mobile energy with an evidence file that travels with it.

Set up once, then repeatable: the same route and the same evidence file, at every edition and every location.

STEP 01

Location and period

Demand profile, period and environmental requirements (noise, emissions, permit) mapped out.

INPUTlocation · period

STEP 02

Powerbox in place

The unit stands on level ground next to the biogas generator and supplies the gas; diesel goes out.

UNITready to connect

STEP 03

Swap during deployment

With longer or more intensive deployments, full and empty units are swapped without interrupting the delivery.

SWAPlogged

STEP 04

Evidence file per deployment

Origin, delivery and consumption per deployment: reusable proof for the permit and the client.

OUTPUTper deployment

The whole chain, step by step

What you pay and why

The same indicator, with your period as input.

For temporary deployment you use the same price indicator as construction. Shorter terms and peak power weigh more heavily; the outcome is a range alongside HVO and alongside doing nothing.

What you enter

  • The power you need and the running hours per day and per week.
  • The term in weeks.
  • Whether you need a generator or already have one.
  • Your postcode, for the transport distance.
Calculate your price indication

Hybrid is an option too

Batteries for the peaks, biogas as the base. The scan takes a qualitative view of which mix fits your site and period, and says so if a battery or an existing set-up is enough on its own.

Start the scan
Lorry with a Powercrumbs unit on a site road between excavators
Delivered along the site road: the unit comes to where the work is
Powercrumbs units beside a charging area with a car
Beside the charging area: power until the grid connection is there

Frequently asked questions

What organisers and site managers ask us first.

Does this work for events and festivals?

Yes. Temporary, recurring deployment is a core situation. The route and the evidence file can be repeated for each edition, including at changing locations.

How soon can something be in place?

After the price indication and the intake meeting we schedule the placement. The lead time depends on site and period; we discuss that up front.

Does the evidence file help with the permit application?

The evidence file substantiates the origin and emissions profile of the energy supply, the information that competent authorities ask for. The legal assessment stays with your adviser.

First step

Calculate your price indication.

Power, running hours, term and postcode. You get a range back, alongside HVO and alongside doing nothing.

Ellen Kolkman, your first point of contact at Powercrumbs, on the phone

Ellen Your first point of contact

Rather talk it through first? Ellen will set up a short 20-minute call, via Teams.

Talk to Ellen