For construction, industry and temporary sites
Power where the grid falls short.
Biogas as a sustainable fuel for construction, industry and temporary power. You choose the situation that applies to you; each situation has a first step of its own that you can take without a conversation.
Choose your situation
Three situations, each with its own first step.
You've already stated your standard: in the tender, in the annual report or in the planning. This is how that standard can be put into practice today, and what you can do yourself before you need to talk to anyone. If you want to build or extend the chain yourself, that's Equipment.
You want a fossil-free construction site; that's possible today, even without a grid connection.
First step: the price indicator, straight on screen.
Go to Energy / Construction
You want to replace fossil gas without shutting down production.
First step: explore your business case with your own figures.
Go to Energy / Industry
You need power in a place where the grid can't deliver it.
First step: the price indicator, with period and power as input.
Go to Energy / TemporaryHow your delivery works
From your question to an evidence file in four steps.
The same chain for every situation: the source is qualified, the Powerbox delivers on site, the swap is scheduled and every step is logged.
STEP 01
Your situation mapped out
Power, period and location via the price indicator, the business case or the scan.
STEP 02
Powerbox on site
The mobile unit delivers biogas next to your installation or to the biogas generator on site.
STEP 03
Swap at your own pace
Full units arrive, empty ones leave, planned around your consumption and logged per swap.
STEP 04
Evidence file per delivery
Origin, transport and metered consumption per delivery, bundled per period for your client, accountant or auditor.
Power for as long as the grid connection takes.
More and more sites are waiting for a grid connection or a capacity upgrade. Biogas from the chain supplies the power in the meantime, on site itself, and the evidence file shows what was used. If the connection does come through, the chain scales back.
How the proof is put togetherWhat you pay and why
What it costs depends on what you choose.
The price follows from what you choose: power, term and distance. You see it before you speak to anyone, alongside HVO, hydrogen and doing nothing.
Construction and temporary: the price indicator
Power, running hours, term and postcode set the range. The outcome sits alongside HVO and alongside doing nothing, and can be shared with your client as a route brief.
Work out your price indicationIndustry: the business case
Your own gas consumption, gas price and CO2 baseline. What biogas costs and returns, alongside hydrogen and alongside doing nothing. Assumptions are shown with source and date next to the outcome.
Explore your business caseCome and see it
See the chain running.
Sit in on a delivery, see a Powerbox next to a crane, a hub in operation. If you'd rather come by before the dates below, Ellen will arrange it.
The next visiting dates follow.
Sign up for a visitPick your situation
Construction, industry or temporary?
Every situation ends in its own first step. If you don't know yet where you fit, the scan picks the route.
Ellen Your first point of contact
Rather talk it over first? Ellen will set up a short 20 minutes call, via Teams.