
WHAT DOES A LOST PROJECT COST?
On the construction site, it’s not about the lowest fuel price, but about feasibility. Downtime, delays due to emission requirements or restrictions in Natura 2000 areas always cost more than the difference per cubic meter of fuel.
The most sustainable fuel results in fewer emissions, less permit risk and more continuity. That means projects that continue instead of stalling.
So the question is not what fuel costs, but what it costs when a project can’t run…

BIOGAS PRICE ESTIMATE
Four steps to a price estimate: Based on energy needs and location, we calculate how much biogas and how many Powerboxes are needed, including logistics. This gives you immediate insight into total deployment and costs per week.
Vul uw contactgegevens en bedrijfsinformatie in.
Vertel ons over uw project: locatie, looptijd en bijzonderheden.
Geef uw energiebehoefte op: vermogen, draaiuren en dagen per week.
Vul de generatorgegevens in: aantal en huurprijs per week.
Kostenopbouw per week
| Component | Per week |
|---|---|
| Gas | – |
| Powerbox huur | – |
| Transport | – |
| Generator | – |
| Totaal per week | – |
Totaal project
| Looptijd | – |
| Totaal projectkosten | – |
We nemen zo snel mogelijk contact met u op.
Plug-and-play biogas
Building in Natura 2000 or a nitrogen-sensitive area? With the Powerbox you work with the cleanest energy on site. Plug-and-play connected to a generator. Fewer emissions, maximum flexibility. Simply arranged.


Green advantages, comparable budget
With HVO biogas you save up to 90% CO₂ emissions and 97% NOx. You run on a renewable fuel, without modifications to your generator. Costs are comparable to diesel – and sometimes even lower, because you avoid fines, downtime and permit issues.
Interested in the Powerbox, biogas use or just want to know more?
We’d love to hear from you!
or call: +31 (0)26 303 12 67
